LAWAS: Travel for folk in Lawas and southern Sabah would be a  breeze when the proposed new Lawas airport is completed under the  second rolling of the Tenth Malaysia Plan (10MP)
GOING  TO THE GROUND: Abdul Rahim (third left) inspecting the Lawas airport  runway where mud is still visible at the side of the runway, accompanied  by Nelson (second left) and ministry officials.
Deputy Minister of Transport Datuk Abdul Rahim Bakri said the present  transportation and communication woes would be addressed by the  building of the airport by the federal government under the mid-term  review of 10MP, which has been regarded as an essential project.
The new airport would also open up communication links around Lawas,  including the Ba Kelalan and Bario highlands apart from neighbouring  Sabah, he said during his working visit here yesterday.“The construction of the new airport is a necessity and not a luxury  for this region,” he said, adding that it would also boost the economic  growth of the district and southern districts of Sabah.
The current fleet of four Twin Otter aircrafts is also slated to be  replaced with more modern aircrafts that meet the requirements of rural  Short Take-off and Landing (STOL) airstrips under the Rural Air Service  (RAS) for Sabah and Sarawak.These reliable aircrafts currently operated by MasWings are already 28 years-old.Rahim said the ministry was informed by Second Minister of Planning  and Resource Management Datuk Amar Awang Tengah Ali Hasan of the problem  of frequent flooding at Lawas airport during rainy spells which caused  much inconvenience to the people.
The increase in passenger traffic would also bring a brighter  prospect for the district’s tourism industry as it is currently  constricted by limited air travel connectivity.The deputy minister also visited the proposed site of the new airport  which has been approved by the state government, and gave the thumbs up  for its strategic location in the economic development triangle of  Sarawak, Sabah and Brunei.He, however, declined to give the cost apart from saying that the  emphasis would be on the runway which is more costly compared to  terminal building.
The present Lawas airport was built in 1961, with a runway of 683  metres long and 18 metres wide at a bend of the Lawas river, making it  impossible to lengthen it and vulnerable to flood.
It recorded 54,210 passengers last year, compared to 48,744 and  45,728 in 2009 and 2008 respectively. There are currently 30 flights  weekly in Lawas-Miri sector, apart from Lawas-Ba Kelalan (six) and  Lawas-Kota Kinabalu (twice).With an annual passenger growth rate of five per cent, volume is  projected to reach 65,728 by 2014, but Malaysia Airport Berhad believes  it can be higher with the new airport that caters for bigger aircrafts  and due to the economic growth in the district.
Meanwhile, Abdul Rahim and his entourage also visited the Road Transport Department office in Lawas which is facing congestion.Also present were Ba Kelalan assemblyman Nelson Balang Rining, Datuk  Abdul Nasir Abdul Razak (MAHB), RTD Sarawak director Mohd Shafiq Anas  Abdullah, Lawas district officer Mohd Supaih Hamdan, heads of department  and community leaders.
 
